Request for Proposal (RFP)
EV Charging Station Installation – CHAMPAIGN, IL
4 × Tesla V4 Superchargers
150kW per port — 600kW total station capacity
Fully Turnkey
Contractor furnishes ALL equipment & materials
5-Year Warranty
Full warranty on all equipment & installation
5-Year O&M + SLA
97% uptime minimum & quarterly maintenance
Champaign, IL
I-57 Exit 238 — I-74 interchange approx. 1.1 miles away
Federal Funding
NEVI/FHWA — BABA, Davis-Bacon & 2 CFR 200
Scope of Work
- 4 × Tesla V4 Superchargers with NACS + CCS1 via Tesla Magic Dock — no charging-equipment substitutions
- 1 × Tesla V4 Supercharger Power Cabinet — 625kVA, 480V AC input
- 750kVA utility transformer & coordination with Ameren Illinois
- 1200A main switchboard, CT/PT metering cabinet & full electrical infrastructure
- Civil work — 4 EV stalls, ADA path/ramp, concrete foundations, grading & drainage
- All signage, striping, bollards, emergency disconnect & site finishing
- All permits, inspections, utility coordination & regulatory approvals
Minimum Qualifications
- Valid Illinois Electrical Contractor & General Contractor Licenses
- Current EVITP Installer Certification — lead electrician or superintendent
- Minimum 2 years of DCFC installation experience
- Minimum 3 completed DCFC projects with references
- Ability to provide 5-year Warranty, O&M and SLA commitments
- SAM.gov eligibility and compliance with BABA, Davis-Bacon & 2 CFR Part 200
Key Dates
Questions & Submissions:
Universal EV LLC
📧 proposal@universalgreengroup.com
📞 (214) 989-4173
All questions must be submitted in writing by September 29, 2026. Site visits are available upon request.
Complete project specifications, scope of work, federal compliance requirements, evaluation criteria, and submission instructions.
Questions? proposal@universalgreengroup.com | Proposals valid 90 days
Download the RFP
Click the button above to download the full RFP document and all supporting materials
Review & Prepare
Review all requirements, submit questions by September 29, and prepare your proposal per Section 6
Submit by October 6
Email your complete proposal to proposal@universalgreengroup.com by October 6, 2026
