Project at a Glance

Design-build, turnkey DC fast charging at Grand Vista Hotel in Scott County, Tennessee.

2 × 180 kW DC Fast Chargers

Dual-port dispensers; minimum 360 kW total station capacity

Complete Design-Build

Contractor supplies PE-stamped engineering, equipment, labor and permits

5-Year Warranty

Equipment, electrical/civil installation and engineering design

5-Year O&M + SLA

97% monthly uptime per port; quarterly preventive maintenance

Helenwood, Tennessee

Grand Vista Hotel — Scott County

Open-Access Charging

OCPP 2.0.1, CCS1, contactless card, RFID and QR payment

Reference design & engineering responsibility: Nordic Asia Solutions reference drawings (Job ID UNE-26-65, Rev 02, August 25, 2026) are a basis of design only and are not construction documents. The contractor must verify site conditions and deliver a complete Tennessee PE-sealed engineering design packet. Owner approval is required before construction.

Scope of Work

  • Verify Nordic Asia Solutions reference drawings and prepare a complete Tennessee PE-sealed engineering design packet
  • Minimum 2 dual-port DC fast chargers rated at least 180 kW each (ABB Terra 184 or approved equal); all 4 ports must charge simultaneously
  • Coordinate with Plateau Electric Cooperative; verify the existing 500 kVA transformer can serve the approximately 384 kVA charger load and other site loads
  • Furnish all utility upgrades if required, electrical service, CT/metering, civil works, foundations, trenching, paving, bollards and signage
  • At least 4 EV stalls, including 1 accessible stall with access aisle and accessible route
  • Permits, inspections, installation, network configuration, testing and commissioning
  • 5-year equipment/design/installation warranty, operations and maintenance, and SLA

Minimum Qualifications

  • Valid Tennessee contractor and required electrical classification licenses
  • Tennessee-licensed professional engineer to seal the design packet
  • Current EVITP certification for at least one lead electrician or superintendent
  • At least 2 years of DCFC installation experience and 3 completed project references
  • Demonstrated DCFC utility coordination and energization experience
  • Ability to deliver 5-year O&M/SLA and 24/7 English/Spanish driver support
  • Required insurance, including general liability and professional liability for design services

Key Dates

RFP Issue Date October 27, 2026
Pre-Bid Site Visit Available upon request
Questions Deadline November 10, 2026
Proposal Submission Deadline November 17, 2026
Anticipated Award December 16, 2026
Anticipated Construction Start March 1, 2027
Substantial Completion April 30, 2027
O&M / SLA Period Start At written commissioning acceptance

Questions & Proposal Submissions:

Universal EV LLC

📧 proposal@universalgreengroup.com

📞 (214) 989-4173

Submit questions in writing by November 10, 2026. Pre-bid site visits are available upon request.

Download the Full RFP

Review the 18-page design-build RFP, including equipment minimums, reference design information, engineering deliverables, qualifications, five-year service commitments, and proposal instructions.

Questions? proposal@universalgreengroup.com  |  Proposals valid at least 90 days  |  Site visit on request

How to Apply

Follow the three steps below to submit your proposal.

01

Download the RFP

Download and review the 18-page RFP and the reference drawing list in Section 2.3.

02

Review & Prepare

Submit any questions by November 10, 2026, and prepare your proposal following Section 6.

03

Submit by November 17

Email your proposal to proposal@universalgreengroup.com by November 17, 2026. Follow the email subject format in Section 9.2.

Open to qualified contractors. State and/or utility incentive program requirements may apply; see Section 8 of the RFP. Contractor is responsible for complete engineering design, utility coordination, and all turnkey project costs.