Request for Proposal (RFP)
EV Charging Station Installation – LITTLE CHUTE, WI
4 × Tesla V4 Superchargers
150kW per port — 600kW total station capacity
Fully Turnkey
Contractor furnishes ALL equipment & materials
5-Year Warranty
Full warranty on all equipment & installation
5-Year O&M + SLA
97% uptime minimum & quarterly maintenance
Little Chute, WI
Directly at I-41 Exit 146 — Outagamie County
Federal Funding
NEVI/FHWA — BABA, Davis-Bacon & 2 CFR 200
Scope of Work
- 4 × Tesla V4 Superchargers with NACS + CCS1 via Tesla Magic Dock — no charging-equipment substitutions
- 1 × Tesla V4 Supercharger Power Cabinet — 625kVA, 480V AC input
- 750kVA utility transformer with combined CT & meter socket — coordination with Kaukauna Utilities
- 1200A main switchboard & full electrical infrastructure per approved drawings and WisDOT requirements
- Civil work — 4 EV charging stalls, van-accessible stall/aisle, concrete foundations, grading & drainage
- Active Shell gas station must remain open — contractor must phase work and maintain safe customer access
- All signage, striping, bollards, emergency disconnect, permits, inspections & site finishing
Minimum Qualifications
- Valid Wisconsin Electrical Contractor License & applicable Wisconsin General/Commercial Contractor credential
- Current EVITP Installer Certification — lead electrician or superintendent
- Minimum 2 years of DCFC installation experience
- Minimum 3 completed DCFC projects with references
- Ability to provide 5-year Warranty, O&M and SLA commitments
- SAM.gov eligibility and compliance with BABA, Davis-Bacon & 2 CFR Part 200
Key Dates
Questions & Submissions:
Universal EV LLC
📧 proposal@universalgreengroup.com
📞 (214) 989-4173
All questions must be submitted in writing by October 12, 2026. Site visits are available upon request and must be coordinated in advance because the Site is an active gas station and convenience store.
Complete project specifications, scope of work, federal compliance requirements, evaluation criteria, and submission instructions.
Questions? proposal@universalgreengroup.com | Proposals valid 90 days
Download the RFP
Click the button above to download the full RFP document and all supporting materials
Review & Prepare
Review all requirements, submit questions by October 12, and prepare your proposal per Section 6
Submit by October 19
Email your complete proposal to proposal@universalgreengroup.com by October 19, 2026